IMPORTANT!
Illumination intensity norms are shown in the working surface luxes: if this is a cabinet, a reading room, or a billiard table, it is the height of the desk, usually 0.8 meters from the floor (G = 0.8); if it's a ladder, a lobby, a gym, a road, or a stadium, it's: floor, road canvas, field (G = 0.0).
№ | Lighted objects |
Medium Illumination (Em), lx at least |
Light distribution (Emin/Em), at least |
---|---|---|---|
Motorways, federal and transit routes. Road class - А | |||
1 | А1. Motorways, federal and transit routes, main arteries of the city (outside the city centre) -with a capacity of more than 10 000 unit/h | 30 | 0,35 |
2 | А2. Other federal roads and main streets (outside the city centre)- with a capacity of 7 000-9 000 unit/h | 20 | 0,35 |
3 | А3. Central highways connecting streets with exit on the A1 (downtown)- with a capacity of 4 000-7 000 unit/h | 20 | 0,35 |
4 | А4. Main historical passes of the centre, internal links of the centre (in the centre of the city) -with capacity of 3 000-5 000 unit/h | 20 | 0,35 |
Main roads and streets of the neighborhood. Road class - B | |||
5 | B1. Main roads and streets of the city of the district (outside the city centre)- with a capacity of 3 000-5 000 unit/h | 20 | 0,35 |
6 | B2. Main roads and streets of the city of the district (downtown)- with a capacity of 2 000-5 000 unit/h | 15 | 0,35 |
Streets and roads of local importance. Road class - V | |||
7 | V1. Transport and pedestrian connections within residential areas and exit on the highway except for the streets with a continuous movement (living outside the city centre)- with a capacity of 1 500-3 000 unit/h | 15 | 0,25 |
8 | V2. Transport and pedestrian connections in residential neighbourhoods and motorways (living in the city centre) -with a capacity of 1 500-3 000 unit/h | 10 | 0,25 |
9 | V3. Transport links within production and public storage areas (in urban industrial, municipal and storage areas)- with a capacity of 500-2 000 unit/h | 6 | 0,25 |
Isolated tram road | |||
10 | Isolated tram road | 10 | - |
Streets and roads in rural settlements | |||
11 | Main streets, squares of social and trade centers | 10 | - |
12 | Main streets of residential buildings | 6 | - |
13 | Secondary (alleys) of the streets of a residential building | 4 | - |
14 | Village roads, orchards and suburbian cooperatives | 2 | - |
№ |
Lighted objects |
Medium illumination (Em), lx at least |
---|---|---|
Petrol stations | ||
1 | Access routes from A and B roads | 15 |
2 | Access roads from B roads | 10 |
3 | Oil refueling and discharge sites | 20 |
4 | The rest of the territory with a carriageway | 10 |
Parking spaces, rolling stock holdings | ||
5 | Outdoor parking on the streets of all categories as well as outside streets, open parking spaces in the neighbourhoods between rows of boxing garages | 6 |
№ |
Lighted objects |
Medium illumination (Em), lx at least |
Light distribution (Emin/Em) at least |
---|---|---|---|
1 | P1. Sites in front of entrances to cultural, sporting, recreational and trading facilities, sports, recreational and trading facilities | 20 | 0,30 |
2 | P2. The main pedestrian streets of the historical part of the city and the main public centres of the administrative districts, impassable and factory areas, landing, children's and recreation areas | 10 | 0,30 |
3 | P3. Pedestrian streets, main and auxiliary entrances of parks, sanatoriums, exhibitions and stadiums | 6 | 0,20 |
4 | P4. Sidewalks separated from the roadways of roads and streets, major passages of neighbourhoods, entrances, passageways and central alleys of children's, educational and health facilities | 4 | 0,20 |
5 | P5. Secondary passages in the territories of neighbourhoods, management sites in the territories of neighbourhoods, side alleys and auxiliary entrances of city parks and central alleys of administrative districts | 2 | 0,10 |
6 | P6. Side alleys and auxiliary entrances of the administrative district parks | 1 | 0,10 |
№ |
Lighted objects |
Medium illumination (Em), lx at least |
Light distribution (Emin/Em) at least |
---|---|---|---|
1 | Passages of underground pedestrian crossings and tunnels | 75 | 0,30 |
2 | Passages of above-ground pedestrian crossings with transparent walls and ceiling or glass wall openings | 75 | 0,30 |
3 | Stairways, exits and inspection sites of above-ground pedestrian crossings with transparent walls and ceiling or glazed wall openings | 50 | 0,30 |
4 | Ladders and ramps of underground pedestrian crossings and tunnels | 45 | 0,30 |
5 | Open footbridges | 10 | 0,30 |
№ |
Lighted objects |
Medium illumination (Em), lx at least |
---|---|---|
1 | Main entrance area | 6 |
2 | Backup and technical entrance area | 4 |
3 | On a pedestrian track long 4 m at the main entrance in building | 4 |
№ |
Lighted objects |
Medium illumination (Em), lx at least |
Light distribution (Emin/Em) at least |
---|---|---|---|
1 | Routes for the evacuation of high-risk areas | 15 | 0,10 |
2 | Escape routes up to 2 m wide | 1 | 0,025 |
3 | Escape lighting of large squares | 0,5 | 0,025 |
№ |
Lighted objects |
Medium illumination (Em), lx at least |
---|---|---|
1 | Security lighting (without special equipment) | 0,5 |
№ |
Lighted objects |
Medium illumination (Em), lx at least |
---|---|---|
1 | Project rooms and rooms, design, drawing desks. (on tables, G 0.8). | 500 |
2 | Analytical Labs. (on tables, G 0.8). | 500 |
3 | Computer and reading halls. (on tables, G 0.8). | 400 |
4 | Labs: of organic and inorganic chemistry, thermal, physical, spectrographic, style metric, photometric, microscopic, x-ray analysis, mechanical and wireless measuring, electronics, preparatory. (on tables, G. 0.8). | 400 |
5 | Office and work rooms, offices. (on tables, G 0.8). | 300 |
6 | Visitors ' facilities, expeditions. (on tables, G 0.8). | 300 |
7 | Rooms for copying. (on tables, G 0.8). | 300 |
8 | Bound spaces. (on tables, G 0.8). | 300 |
9 | Design, carpentry and repair shops. (on tables, G 0.8). | 300 |
10 | Reading catalogs. (on the front of the files, V-1.0). | 200 |
11 | Conference rooms, meeting rooms. (on tables, G 0.8). | 200 |
12 | Recreations, lobbies, foyers. (on floor, G-0.0). | 150 |
13 | Depository and archives, public access facility. (On racks. V-1.0). | 75 |
№ |
Lighted objects |
Medium illumination (Em, lx at least |
---|---|---|
1 | Operating room, credit group, cash room. (on tables, G 0.8). | 400 |
2 | Server room, interbank electronic accounts rooms. (on tables, G 0.8). | 400 |
3 | Place of manufacture, processing of identification cards. (on tables, G 0.8). | 400 |
4 | Department of collection, collector. (on tables, G 0.8). | 300 |
5 | Facilities for the servicing of natural persons. (on tables, G 0.8). | 300 |
6 | Depository, supply closet, value store. (on tables, G 0.8). | 200 |
7 | Strong room (on tables, G 0.8). | 150 |
№ |
Lighted objects |
Medium illumination (Em), lx at least |
---|---|---|
1 | Classrooms, classrooms, study cabinets, general education laboratories, boarding schools, and specialized and vocational technical institutions. (on whiteboard). | 500 |
2 | Technical drafting and drawing rooms. (on tables, G 0.8). | 500 |
3 | Classrooms, classrooms, study cabinets, general education laboratories, boarding schools, and specialized and vocational technical institutions. (on tables, G 0.8). | 400 |
4 | Classrooms, study cabinets, technical laboratories and higher education institutions. (on tables, G 0.8). | 400 |
5 | Informatics and Computer Science rooms. (on tables, G 0.8). | 400 |
6 | Laboratories in classrooms. (on tables, G 0.8). | 400 |
7 | Service-type offices. (on tables, G 0.8). | 400 |
8 | Metal and wood processing workshops. (on tables, G 0.8). | 300 |
9 | Entertainers of the Act halls. (on the floor, G-0.0). | 300 |
10 | Offices and teachers ' rooms. (on tables, G 0.8). | 300 |
11 | Gyms. (on the floor, G-0.0). | 200 |
12 | Act halls, cinemas. (On the floor, G-0.0). | 200 |
13 | Recreations. (On the floor, G 0.0). | 150 |
14 | Covered pools. (On the surface of the water). | 150 |
15 | Gyms. (at a level of 2.0 m from the floor). | 75 |
№ |
Lighted objects |
Medium illumination (Em), lx at least |
---|---|---|
1 |
Multi-Purpose halls. (G-0.8). |
400 |
2 |
Theater halls, concert halls. (G-0.8). |
300 |
3 |
Mug rooms, musical classes. (G-0.8). |
300 |
4 |
The auditoriums of clubs, the club is the living room, the room for leisure activities, meetings, and the foyer of the theatres. (G-0.8). |
200 |
5 |
Exhibition halls. (G-0.8). |
200 |
6 |
The lobby of cinemas, clubs. (On the floor, G-0.0). |
150 |
7 |
The movies, the sound and the light rooms (G-0.8). |
150 |
8 |
Cinema halls. (G-0.8). |
75 |
|
|
Medium illumination |
1 |
Music and gymnastics, dining rooms. (On the floor, G 0.0). |
400 |
2 |
Group, playing rooms. (On the floor, G-0.0). |
400 |
3 |
Dressing rooms. (On the floor, G-0.0). |
300 |
4 |
Medical office. (G-0.8). |
300 |
5 |
Sick-bays, rooms for sick children. (On the floor, G-0.0). |
200 |
6 |
Reception rooms. (on the floor, G 0.0). |
200 |
7 |
Dormitories. (on the floor, G-0.0). |
100 |
|
|
Medium illumination |
1 |
The classrooms of children's sanatoriums. (On the floor, G 0.0). |
500 |
2 |
Rooms, dormitories. (On the floor, G 0.0). |
100 |
|
|
Medium illumination |
1 |
Halls of sport games. (On the floor, G 0.0). |
200 |
2 |
Aerobic halls, gymnastics, wrestling rooms. (On the floor, G 0.0). |
200 |
3 |
Bowling. (on the floor, G-0.0). |
200 |
4 |
Pool hall. (On the surface of the water). |
150 |
5 |
The halls of sports. (at an altitude of 2 m, V-2.0). |
75 |
|
|
Medium illumination |
1 |
Dining halls of restaurants, dining rooms. (G-0.8). |
200 |
2 |
Handout rooms. (G-0.8). |
200 |
3 |
Hot workshops, cold workshops, preparation and billet rooms. (G-0.8). |
200 |
4 |
Washing rooms of kitchen and dining room, room for cutting bread. (G-0.8). |
200 |
|
|
Medium illumination |
1 |
Shopping halls for self-service stores. (G-0.8). |
400 |
2 |
Store Shopping Halls: bookstores, ready-made dresses, linens, footwear, tissues, fur products, headgear, perfumes, haberdashery, jewellery, electricity, and the food, without self-service. (G-0.8). |
300 |
3 |
Fitting rooms. (V-1.5). |
300 |
4 |
Main cash premises. (G-0.8). |
300 |
5 |
Offices of order departments, service bureau. (G-0.8). |
200 |
6 |
Store Shopping Halls: utensils, furniture, sporting goods, building materials, electrical appliances, toys and office supplies. (G-0.8). |
200 |
|
|
Medium illumination |
1 |
Repair shops: watch repair, jewelry and engraver work. (G-0.8). |
3000/300 |
2 |
Repair shops: construction and repair of the headgear, fur sewing work. (G-0.8). |
2000/750 |
3 |
Repair shops: repair of shoes, galantere, metal, plastic products, household appliances. (G-0.8). |
2000/300 |
4 |
Repair shops: rhoto-, film, radio and television repair. (G-0.8). |
2000/200 |
5 |
Clothing and knitting Handicrafts rooms: sewing rooms, closed branches, clothing repair units. (on tables, G 0.8). |
750 |
6 |
Laundry: clothing repair. (G 0.8). |
750 |
7 |
Apparel Chemical Cleaning Shop: staining offices. (G-0.8). |
500 |
8 |
Clothing and knitting Handicrafts rooms: departments of the hand and the machine strap. (G-0.8). |
500 |
9 |
Photolabs. (G-0.8). |
400 |
10 |
Hairdressing offices. (G-0.8). |
400 |
11 |
Laundry: drying and ironing shops (manual). (G-0.8). |
300 |
12 |
Clothing and knitting Handicrafts rooms: Application preparation offices. (G-0.8). |
300 |
13 |
Clothing and knitting Handicrafts rooms: ironing steaming rooms (G-0.8). |
300 |
14 |
Recording Studios: rooms for recording and listening, phonotechs. (G-0.8). |
200 |
15 |
Rental points: Facilities for visitors. (G-0.8). |
200 |
16 |
Apparel Chemical Cleaning Shop: Reception and clothing, dry-cleaning facilities. (G-0.8). |
200 |
17 |
Laundries and self-service. (On the floor, G-0.0). |
200 |
18 |
Laundry: Separation and Laundry divisions. (G-0.8). |
200 |
19 |
Laundry: drying and ironing shops (mechanical). (G-0.8). |
200 |
20 |
Laundry: Washing compartments, laundry, solution preparation, storage of washing materials. (G-0.8). |
200 |
21 |
Laundry: hand in and handout of clothing rooms (G-0.8). |
200 |
22 |
Photos: hand in and handout of orders (G-0.8). |
200 |
23 |
Saunas - waiting and cooling. (G-0.8). |
150 |
24 |
Rental points: Storages. (G-0.8). |
150 |
25 |
Photos: The survey room of photo saloon. (G-0.8). |
100 |
26 |
Saunas - pools. (on the floor, G-0.0). |
100 |
27 |
Saunas - undressing, washing, shower and steaming rooms (on the floor, G-0,0). |
75 |
28 |
Apparel Chemical Cleaning Shop: storage facilities for chemicals. (G-0.8). |
50 |
|
|
Medium illumination |
1 |
For closed warehouses for floor storage with gas-discharge lamps |
75 |
2 |
For closed warehouses with incandescent lamps |
50 |
3 |
For shelf storage with gas-discharge lamps |
200 |
4 |
For shelf storage with incandescent lamps |
100 |
5 |
For open warehouses |
20 |
6 |
Reception and issuance expedition |
150 |
7 |
Sorting and picking of goods |
200 |
|
|
Medium illumination |
1 |
Service desk, duty and service staff. (G-0.8). |
200 |
2 |
Guest rooms, rooms. (On the floor, G-0.0). |
150 |
|
|
Medium illumination |
1 |
Children rooms. (on the floor, G-0.0). |
200 |
2 |
Living rooms, kitchens. (On the floor, G-0.0) |
150 |
3 |
Buildings: Concierge facilities. (On the floor, G-0.0). |
150 |
4 |
Hallways, baths, bathrooms. (On the floor, G-0.0). |
50 |
5 |
Buildings: Lobbies. (On the floor, G-0.0). |
30 |
6 |
Buildings: Floor and elevator halls, ladders, and stairwells. (On the floor, G-0.0). |
20 |
|
|
Medium illumination |
1 |
Medical points: Procedural cabinets. (G-0.8). |
500 |
2 |
Medical points: Doctors ' offices, first-aid rooms. (G-0.8). |
300 |
3 |
Medical points: Waiting rooms, registry, duty staff rooms. (G-0.8). |
200 |
4 |
Sanitary Facilities: Lavatories, latrines, smoking rooms. (On the floor, G-0.0). |
75 |
5 |
Sanitary Facilities: Shower, wardrobe, laundry and footwear, and heat-dryer facilities. (On the floor, G-0.0). |
50 |
|
|
Medium illumination |
1 |
Assistant, aseptic, analytic, filling, concentrates preparatory room and semi-finished goods, and control and marking. (G-0.8). |
500 |
2 |
Prescription department, manual sales, optics, ready-made medications. (G-0.8). |
300 |
3 |
Storage facilities for medicines and dressings, dishes. (G-0.8). |
150 |
4 |
Storage of acids, disinfectioned means, fuel and flammable liquids. (G-0.8). |
75 |
5 |
Container closet. (G-0.8). |
50 |
|
|
Medium illumination |
1 |
Computing Center. (G-0.8). |
400 |
2 |
Prescription department, manual sales, optics, ready-made medications. (G-0.8). |
300 |
3 |
Waiting rooms, operations, cash halls, ticket baggage, liaison, operator, Dispatch. (G-0.8). |
300 |
4 |
Rooms of the mother and child, long stay of the passengers room. (On the floor, G-0.0). |
200 |
5 |
Distribution halls, hallways. (On the floor, G-0.0). |
150 |
|
|
Medium illumination |
1 |
Recreational areas, playgrounds in front of theatres, cinemas, exhibition pavilions and open entertainments; Tabletop Games: Exhibitions. (G-0.0). |
20 |
2 |
Recreational areas, playgrounds in front of theatres, cinemas, exhibition pavilions and open entertainments; Tabletop Games: City parks and gardens of administrative districts. (G-0.0). |
10 |
3 |
Main entrances: Stadiums and exhibitions. (G-0.0). |
10 |
4 |
Central Alleys: Exhibitions. (G-0.0). |
10 |
5 |
Recreation areas in exhibitions. (G-0.0). |
10 |
6 |
Main entrances: City parks. (G-0.0). |
6 |
7 |
Auxiliary entrances: Stadiums and exhibitions. (G-0.0). |
6 |
8 |
Central Alleys: Stadiums. (G-0.0). |
6 |
9 |
Side Alleys: Exhibitions. (G-0.0). |
6 |
10 |
Main entrances: Gardens of administrative districts. (G-0.0). |
4 |
11 |
Central Alleys: City parks. (G-0.0). |
4 |
12 |
Side Alleys: Stadiums. (G-0.0). |
4 |
13 |
Auxiliary entrances: City parks. (G-0.0). |
2 |
14 |
Central Alleys: Gardens of administrative districts. (G-0.0). |
2 |
15 |
Side Alleys: City parks. (G-0.0). |
2 |
16 |
Auxiliary entrances: Gardens of administrative districts. (G-0.0). |
1 |
17 |
Side Alleys: Gardens of administrative districts. (G-0.0). |
1 |
№ |
Sport |
|
Minimum horizontal illumination (Emin), lx |
|
Open structures |
Covered structures |
|||
1 |
Football |
Training |
50 |
300 |
Competition |
100 |
500 |
||
2 |
Ice hockey, figure skating |
Training |
100 |
500 |
Competition |
400 |
500 |
||
3 |
Hockey with a ball on the grass |
Training |
50 |
150 |
Competition |
100 |
500 |
||
4 |
Ice skating |
Training |
50 |
150 |
Competition |
100 |
500 |
||
5 |
Badminton, basketball, volleyball, hand-ball |
Training |
50 |
300 |
Competition |
400 |
500 |
||
6 |
Tennis |
Training |
100 |
300 |
Competition |
400 |
500 |
||
7 |
Table Tennis |
Training |
150 |
400 |
Competition |
- |
500 |
||
8 |
Akrobatics, gymnastics, fencing |
Training |
30 |
200 |
Competition |
400 |
500 |
||
9 |
Boxing, wrestling |
Training |
30 |
200 |
Competition |
- |
1000 |
||
10 |
Athletics |
Training |
50 |
150 |
Competition |
100 |
- |
||
11 |
Heavy Athletics |
Training |
30 |
150 |
Competition |
- |
500 |
||
12 |
Swimming |
Training |
100 |
150 |
Competition |
- |
400 |
||
13 |
Water polo |
Training |
100 |
200 |
Competition |
- |
400 |
||
14 |
Diving |
|
100 |
150 |
15 |
Jumping on a trampoline |
|
- |
200 |
16 |
Shooting |
|
- |
75 |
17 |
Chess Checkers |
|
- |
150 |
18 |
Gyms. (on the floor, G-0.0). |
|
- |
200 |
19 |
Covered pools. (On the surface of the water). |
|
- |
150 |
20 |
Aerobic halls, gymnastics, wrestling |
|
- |
200 |
|
|
Medium illumination |
1. Foundries for the production and repair of machinery, machinery, structural rooms and metal |
||
1.1 |
Provo Branch (fragmentation of scrap metal). Scrap yard, site, lifter landing. Walk through the workshop and workplace approaches. (G-0.0). |
75 |
1.2 |
For mix preparation compartment of transporters. (G-0.8). |
30 |
1.3 |
Mix Preparation Runners Branch. (G-0.8). |
200 |
1.4 |
For mix Preparation Waltz Branch, filters. Bar department. Forming department overall level of illumination by branch. Fabrication of forms, assembly of bottles, placement of bars for large and medium molding. Technological processing of models, drying. office of knockout the overall level of illumination by branch. Mechanical cut forms and bars from bottles. (G-0.8). |
150 |
1.5 |
Forming department Fabrication Molding forms. (G-0.8). |
300 |
1.6 |
Bar section drying and storage of bars. Forming Department of bottles Supply and forms to fill. (G-0.0). |
50 |
1.7 |
Filling section site of the inspection and repair of furnaces, furnaces. (G-0.0). |
30 |
1.8 |
The site of bottle cooling. (G-0.0). |
10 |
2. Forging rooms of the production and repair of machinery, machinery, steel and metal |
||
2.1 |
Preparing department. Forging department. Mechanical division overall level of illumination by branch. (G-0.8). |
200 |
2.2 |
Mechanical Branch tumbling drums. (G-0.8). |
150 |
3. Cold stamping rooms, departments of production and repair of machinery, machinery, steel and metal |
||
3.1 |
Overall level of illumination by workshop, department. Press, stamps, bending machines with manual feed. (G-0.8). |
200 |
3.2 |
vending machines. (G-0.8). |
150 |
4. Thermal rooms, departments of production and repair of machinery, machinery, steel and metal |
||
4.1 |
Overall level of illumination by workshop, department. (G-0.8). |
150 |
4.2 |
Thermal ovens, furnaces, HDTV, hardening baths, cooling baths. (G-0.8). |
200 |
5. Rooms suppression, (galvanic rooms) production and repair of machinery, mechanisms, steel and metal |
||
5.1 |
The overall level of illumination on the workshop. The tubs, the washing, the metal plating. (G-0.8). |
200 |
5.2 |
QCD. (G-0.8). |
500 |
5.3 |
Sewage treatment plants. (G-0.0). |
10 |
6. Rooms of the production and repair of machinery, machinery, steel and metal |
||
6.1 |
Procurement offices, parcels. (G-0.8). |
200 |
6.2 |
Procurement offices, parcels in open sites. (G-0.8). |
50 |
6.3 |
Drilling site. (G-0.8). |
150 |
7. Welding and assembly-welding rooms, compartments, production and repair areas of machinery, machinery, assembly and Metal |
||
7.1 |
The overall level of illumination on the workshop. Welding, cutting, melting. (G-0.8). |
200 |
7.2 |
Markup, dabbing. (G-0.8). |
300 |
8. Painting rooms production and repair of machinery, machinery, steel and metal |
||
8.1 |
Painting Rooms The overall level of illumination on the workshop. Preparatory operations (clean-up, degreasing, primer painting). Painting of structures, construction machines, equipment, etc. (G 0.8). |
200 |
9. Mechanical and instrumental ROOMSS, rooms snap-ins for the production and repair of machinery, machinery, steel and metal |
||
9.1 |
Tubing-Mechanical room The overall level of illumination on the workshop. Processing of tubing complex design on radial-drilling machines. (G-0.8). |
200 |
9.2 |
Mechanical, instrumental rooms, compartments, parcels, rooms snap-in the general level of illumination on the workshop (G-0.8). |
300 |
9.3 |
Mechanical, tool rooms, compartments, parcels, roomsed snap-ins, plumbing, circle work, drawing work. (G-0.8). |
500 |
9.4 |
Mechanical, instrumental rooms, branches, parcels, rooms of the QCD snap-ins. (G-0.8). |
750 |
10. Repair and mechanical rooms production and repair of machinery, machinery, steel and metal |
||
10.1 |
The overall level of illumination on the workshop. Dismantling machines, mechanisms. Dismantling of machine nodes, mechanisms after washing. (G-0.8). |
200 |
10.2 |
Separation of engines, motors, pumps and other electric, hydraulic, pneumatic equipment. (G-0.8). |
300 |
10.3 |
Division of repair of track-type vehicles. (G-0.8). |
150 |
11. Welding rooms of the production and repair of machinery, machinery, steel and metal |
||
11.1 |
Separates the assembly of large nodes of machines, machinery, and equipment. (G-0.8). |
150 |
11.2 |
Separation of assembly of medium nodes of machinery, machinery, tools of small mechanization, equipment. A shop, a branch, a piece of assembly machines, machinery, and equipment. (G-0.8). |
200 |
11.3 |
Separation of electrical, hydraulic, pneumatic equipment assembly. (G-0.8). |
300 |
12. Electrical rooms production and repair of machinery, machinery, steel and Metal |
||
12.1 |
The overall level of illumination on the workshop. Section of panels, remotes, cabinets, etc. (G 0.8). |
200 |
12.2 |
A section of a wire, winding operations, assembly of fixtures, and other electrical equipment. (G-0.8). |
300 |
13. Abrasive rooms of production and repair of machinery, machinery, steel and metal |
||
13.1 |
The overall level of illumination on the workshop. Department of forming mass preparation. The branch, the section of the abrasive heat. (G-0.8). |
150 |
13.2 |
Press department. (G-0.8). |
200 |
13.3 |
Separation of mechanical treatment of the abrasions, hardness test and rupture, QCD. (G-0.8). |
500 |
14. Concrete mixing Workshop for the production of RC and blocks structures and articles |
||
14.1 |
Concerete mixing node overall luminance level by branch office. Concrete office. Mixer. (G-0.8). |
10 |
14.2 |
Concrete office node dosing office. (G-0.8). |
150 |
15. Reinforcing workshop for the production of RC and blocks structures and products |
||
15.1 |
Reinforcing blank compartment The overall level of illumination by department. Welding shop, general level of illumination by workshop, department. Welding positions, vending machines, cars. Department of rebar assembly general level of illumination by compartment. (G-0.8). |
200 |
16. Forming Workshop for the production of RC and blocks structures and articles |
||
16.1 |
Forming workshop The overall level of illumination on the workshop. (G-0.8). |
150 |
16.2 |
Humidity room. (G-0.8). |
50 |
16.3 |
Section of the deck, insulation, finishing, QCD and marking. (G-0.8). |
200 |
17. Production of silicate bricks |
||
17.1 |
Grinding Department. The limestone roasting department. Grind branch. Mass preparing department (G-0.8). |
75 |
17.2 |
Control of finished products. The press, the handlers. Forming Department. Overall level of illumination by department. (G-0.8). |
200 |
18. Production of red clay brick |
||
18.1 |
Roasting shop. (G-0.0). |
75 |
18.2 |
Drying stoves. (G-0.8). |
75 |
18.3 |
Control of finished products. (G-0.8). |
200 |
19. Lime Production |
||
19.1 |
Overall level of illumination by laboratory. Lab equipment, appliances. (G-0.8). |
300 |
19.2 |
Overall level of illumination by department. (G-0.0). |
75 |
20. Granite and Marble Treatment |
||
20.1 |
Granite and marble rooms. The overall level of illumination by the workshops. (G-0.8). |
150 |
20.2 |
Sawing up of the natural stone to the slabs. The cutting and reinforcement of slabs on the milling machines. (G-0.8). |
200 |
20.3 |
Polishing of slabs. (G-0.8). |
300 |
20.4 |
QCD. (G-0.8). |
500 |
20.5 |
Packaging of finished slabs. (G-0.0). |
75 |
21. Woodworking plants and rooms. Sawmill production. |
||
21.1 |
Sites for the unloading (loading) of raw materials, sawnwood, finished goods from transport (to transport). (G-0.0). |
10 |
21.2 |
Overall level of illumination by department. Sawmill frame (on the side of the log feed), second floor. Sawing up of wood on tape, circular, and pendulum saws. (G-0.8). |
200 |
21.3 |
Department of sorting, rejection lumber. Lumber Processing Department. (G-0.8). |
100 |
21.4 |
Waste processing and Transportation division, first floor. (G-0.8). |
100 |
22. Woodworking plants and rooms. Carpentry. |
||
22.1 |
Overall level of illumination by department. Site of cutting and marking. Automatic line. Assembly department. Department of clay preparation. Painting and varnish separation. (G-0.8). |
150 |
22.2 |
Grinding machines. Window and door block glazing segments. Preparation and coverage of products with varnishes and paints. (G-0.8). |
200 |
22.3 |
Texture pick areas and key labels. Polishing (cleaning) the surface of the product. (G-0.8). |
300 |
23. Manufacturing of container and collection-type inventory |
||
23.1 |
The overall level of illumination on the workshop. Site of assembly of volumetric blocks. Line of panels (vajmy, press, manipulators, beds, nail machines, stowage heater). (G-0.8). |
150 |
23.2 |
Site of roof elements. Site of chamfering and splicing the boards along the length and section. Site of slab cutting by format. Site of gluing slabs. (G-0.8). |
150 |
24. Production of wooden glued structures (DKK) |
||
24.1 |
Overall level of illumination by department. (G-0.8). |
150 |
24.2 |
Storage locations of the packages. (G-0.0). |
50 |
25. Maintenance rooms, offices, sites |
||
25.1 |
Overall level of illumination by workshop, department, site. (G-0.8). |
300 |
25.2 |
Carbide, cutter, rolling. Sawing stamps for tooth punch. Assembly tables, inspection and control of ready-made tools, workbenches. (G-0.8). |
300 |
25.3 |
Warehouses of metal, scrap metal, lumber, raw materials, crumbling material (gravel, sand, cement, etc.), finished products. (G-0.0). |
20 |
26. Automobile Service Enterprises |
||
26.1 |
Car washing and cleaning. (G-0.0). |
150 |
26.2 |
Maintenance and repair of vehicles. (G-0.0). |
200 |
26.3 |
Daily maintenance of vehicles. (V - on the machine). |
75 |
26.4 |
Inspection ditches. (G - Bottom of the car). |
150 |
26.5 |
Departments: Motor, aggregate, mechanical, electrical and power supply. (G-0.8). |
300 |
26.6 |
Forging, welding and copper departments Carpentry and strips branches. Repair and installation of tyres. (G-0.8). |
200 |
26.7 |
Car storage facilities. (G-0.0). |
20 |
26.8 |
Open car storage sites. (G-0.0). |
5 |
27. Boiler rooms |
||
27.1 |
Boiler service sites. (G-0.0). |
100 |
27.2 |
sites and ladders of boilers and economizerss, aisles behind the boilers. (G-0.0). |
10 |
27.3 |
Pumps rooms, fans, bunker, fuel. (G-0.8). |
100 |
27.4 |
Condensation, chemical water purification, aerator, boiler rooms (G-0.0). |
100 |
27.5 |
Bin room. (Г-0.8). |
20 |
28. Premises |
||
28.1 |
Transformers and reactors ' rooms. (V-1.5). |
50 |
28.2 |
Distribution unit rooms (V-1.5). |
100 |
28.3 |
Battery room. (G-0.5). |
50 |
28.4 |
Battery repair. (G-0.8). |
200 |
29. Facilities for electric and electric forklifts |
||
29.1 |
Parking and charging facilities. (G-0.0). |
50 |
29.2 |
Repair of electric cars and electric forklifts. (G-0.0). |
200 |
29.3 |
Electrolyte and distillation rooms. (G-0.8). |
160 |
30. Engineering network facilities and other technical facilities |
||
30.1 |
Ventilation facilities (except air conditioning). (G-0.8). |
20 |
30.2 |
Air conditioning, pumps, heaters rooms. (G-0.8). |
75 |
30.3 |
The machine rooms of the pumps, the compressors, the air blowers and the staff are constantly on duty. (G-0.8). |
150 |
30.3 |
Machine rooms of the pumps, the compressors, air blowers without a permanent staff shift. (G-0.8). |
100 |
30.4 |
Rooms for utility networks. (G-0.0). |
20 |